TrafficControl: Overview of the Program

The program simulates a train network.

To run a predefined network, the icons in the red box are used. They are:

  • Import Traffic Network File
  • Start/pause the simulation
  • Step simulation one second
  • Set the simulation speed

The icons in the green box are toggling the different windows in the application.

The icon in the blue box is used for the network designer.

The violet box in the lower left corner shows the simulated time.


No comments:

Post a Comment